INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER
Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE "SAMPLE" FORM
A.After reading the instructions at the top of the application, locate the PECO regional office in which the service is requested. Check the appropriate box and mail or fax the completed application to the appropriate regional office.
B.Complete the fields for customer's name and service location. Customer's Driver's License Number or Social Security Number is now required.
Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.
(**) Use the address of the service when applying for underwriter's inspection.
C.Complete the fields for customer's PECO billing address or account number (within last 60 days).
D.Complete fields regarding you as the electrician or contractor, and indicate where you would like the reply sent. The Electrician/Builder Tax Identification number is now required. Also, please include the date you would like the reply returned to you.
E.Indicate your current construction status, and include the date PECO service is requested. Please avoid using "as soon as possible".
F. thru J. Indicate the following:
•Type of Request
•Type of Service (include number of units and area per unit)
•Service Characteristics
•Meter Information
•Heating/Air Conditioning
K.Complete the table concerning the load characteristics of the service. For each applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW Demand, and 3) Maximum Winter KW Demand.
L.Complete the table concerning motor information.
M.If compensated metering will be used, indicate totalizer and general load (KW).
N.Include any additional comments.
O. |
Application MUST be signed and dated. |
Forms Rev. 5/18 |
PECO
Application for Electric Service & Meter
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL
NEW BUSINESS SERVICES
PHILADELPHIA |
|
|
|
DELAWARE & CHESTER COUNTIES |
BUCKS & MONTGOMERY |
|
|
|
|
|
|
|
NEW RESIDENTIAL |
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||
COUNTY |
|
|
|
1050 W. Swedesford Rd. |
COUNTIES |
|
|
|
|
|
|
|
|
|
CONSTRUCTION |
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
|
|
|
||||||||||||||||||||||||||||||||||||||||
830 S. Schuylkill Ave. |
Berwyn, PA 19312 |
|
|
|
|
400 Park Ave. |
|
|
|
|
|
|
|
|
|
(All Counties) |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
Philadelphia, PA 19146 |
Email:DelChesterServiceApplications@ex |
Warminster, PA 18974 |
|
|
|
|
|
|
|
|
|
400 Park Ave. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
Email:PhilaNewBusiness@e |
eloncorp.com |
|
|
|
|
|
|
|
Email:Bucksmontserviceapplications@e |
Warminster, PA |
18974 |
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||
xeloncorp.com |
|
|
|
Fax # (610) |
|
|
|
|
xeloncorp.com |
|
|
|
|
|
|
|
|
|
Email:NRCGMETERORDERS@P |
|||||||||||||||||||||||||||||||||||||
Fax # (215) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER NAME |
|
|
|
|
|
|
|
|
|
|
|
|
Tax ID # or SSN |
|
|
TYPE OF REQUEST |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New Service |
|
|
Load Increase/Decrease |
|
Reintroduction of Service |
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Temporary Service |
Upgrade/Changes |
|
Demolition (Remove |
|
|
|
||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Separation of Wiring |
Service Relocation |
|
|
|
Service) |
|
|
|
|
|
|
|||||||||||||||||||||||
** ADDRESS TO BE SERVED |
|
|
B |
|
|
|
|
|
APARTMENT/LOT # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
F |
|
|
|
|
|
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
energize/Cover) |
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CITY, STATE |
|
|
|
|
|
|
|
|
|
|
|
|
ZIP CODE |
|
|
|
|
|
|
TYPE OF SERVICE: Please include site plan. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RESIDENTIAL |
|
|
|
|
|
|
|
|
|
|
|
|
COMMERICAL |
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Single House |
Mobile Home |
Store |
|
|
|
|
Office |
|
|
|
G |
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Apartment |
Modular Home |
Industrial |
|
|
|
|
Warehouse |
|
|
|
||||||||||||||||||||||||
UTILITY POLE# |
SUBDIVISION/DEVELOPMENT |
|
|
TOWNSHIP/MUNICIPALITY/WARD# |
|
Duplex |
Town House |
Restaurant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other _____________________________ |
Other _____________________________ |
|||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Area of Building _______________________ Sq. Ft. |
|
|
|
|
|
|
||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* If Applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SERVICE CHARACTERISTICS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
** Please use this address when applying for underwriter’s inspection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
|
|
WIRES |
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Underground |
|
|
Aerial |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
CUSTOMERS BILLING ADDRESS |
|
C |
|
|
|
|
PECO ENERGY ACCOUNT# |
|
|
|
|
|
|
|
|
|
|
3 |
|
|
240 |
|
|
|
3 |
|
|
|
|
|||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AMPS _________ |
|
|
|
|
|
3 |
|
|
120/240 |
|
|
|
4 |
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
WIRES |
|
|
|
|
|
|
|
3 |
|
|
120/208 |
|
|
|
4 |
|
|
|
|
|||||||||
CITY, STATE |
|
|
ZIP CODE |
|
|
|
|
|
TELE. # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120 |
|
|
2 |
|
|
|
|
|
|
|
|
3 |
|
|
277/480 |
|
|
|
4 |
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120/240 |
|
3 |
|
|
|
|
|
|
|
|
3 |
|
|
13200 |
|
|
|
3 or 4 |
||||||||||||
SEND REPLY TO: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
120/240 |
|
5 |
|
|
|
|
|
|
|
|
3 |
|
|
33000 |
|
|
|
3 or 4 |
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
ELECTRICIAN’S OR BUILDER’S NAME |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
METER INFO: |
Two Meters, Commercial (General/Totalizer) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I |
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Single Meter Required |
|
|
|
|
|
|
|
Multiple Meter Total No. _____________ |
|
|
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ADDRESS |
|
|
|
|
|
|
|
|
|
|
Reply Requested by: |
|
|
HEATING/AIR CONDITIONING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
D |
|
|
|
|
|
|
/ |
/ |
|
|
|
Central Air _____ Tons |
|
Resistance |
|
|
|
J |
|
Heat Pump _____ Tons |
|
|
|
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
Natural Gas |
|
|
|
Propane |
|
|
|
|
|
Type |
|||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other ________________ |
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
City, State |
|
|
|
|
|
|
|
|
|
|
ZIP CODE |
|
|
|
|
|
|
CHARACTERISTICS OF NEW OR ADDITIONAL LOAD: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONNECTED |
|
PECO ENERGY USE ONLY (DEMAND) |
|
||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TYPE |
|
LOAD (kW) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
TELE. # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUMMER (kW) |
|
|
|
Winter (kW) |
|
|||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIGHTING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
K |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
CURRENT CONSUTRCTION STATUS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HEATING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
Not Started – Date Customer Will Start Work: _____/_____/_____ |
In Progress Completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
AIR/COND. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
Approximate Date Service Requested: _____/_____/_____ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
E |
|
|
|
TANKLESS WATER HTR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MISC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER COMMENTS/ DESCRIPTIN OF WORK |
|
|
N |
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Include single line diagram and substation arrangement if appropriate. |
||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LARGEST MOTOR SPECIFICATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
O |
|
|
|
|
|
|
|
|
|
|
QUANTITY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTALIZER LOAD |
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SIZE (HP) |
|
|
|
|
|
|
|
|
|
|
L |
|
|
|
|
|
|
|
|
M |
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LOCKED ROTOR CURRENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KW |
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MOTOR CODE LETTER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
SUBMITTED BY: _________________________________ DATE: ______________________ |
|
PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GENERAL LOAD |
|
|
|
||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
|
VOLTAGE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
PECO
Application for Electric Service & Meter
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
PURPOSE
KW
INFORMATION BELOW WILL BE FILLED IN BY PECO: |
|
|
|
|
|
|
|
|
|
|
|
Service Request No. |
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
BUS/MAJ ACCT REP |
|
TELEPHONE |
DATA RECEIVED |
DESIGNER |
|
|
|
|
|
DATA RECEIVED |
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TELEPHONE |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
POL SUB |
|
RATE |
|
RIDER |
|
CONTRACT LIMITS |
|
SIC NUMBER |
|
T |
|
DATE REPLY |
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NUMBER |
|
COMPLETED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
AMPS |
|
WIRES |
|
VOLTAGE |
PHASE |
|
|
CIRCUIT |
|
|
|
|
|
|
LOAD (KVA) |
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUMMER_____WINTER ____ |
|
SERVICE CHARACTERISITICS – Select One from Each |
|
|
|
|
|
|
|
|
|
POLE # / MH # LOCATION |
|
CUT THROUGH DATE |
|||||||||||
SERVICE TYPE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Aerial |
|
|
|
Underground |
URD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
RATE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Residential |
|
|
Comm (Non- |
|
Comm (Demand) |
|
HT/PD |
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
Demand) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GENERATION PROCUREMENT CLASS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
Class 1 (Residential) |
|
|
|
Class 2 (Commercial, less than 100kW) |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
Class 3 (Commercial, 100kW to 500kW) |
|
Class 4 (Commercial, greater than 500kW) |
|
|
|
|
|
|
|
|
|
|
|||||||||||
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load |
|
|
|
|
|
|
|||||||||||||||||
estimates for the first year of service. The customer’s Procurement Class will be adjusted each year, |
|
|
|
|
|
|
|||||||||||||||||
based on actual usage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
METER TYPE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KWH |
|
|
IND. DEMAND |
RECORDER |
TOU |
|
|
|
|
|
|
|
|
|
|
||||||||
SERVICE PHASING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
SINGLE PHASE |
TWO PHASE |
THREE PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
SERVICE REQUIREMENTS: |
|
|
|
|
|
|
METERING LOCATION AND REQUIREMENTS: |
|
|
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
Present Location: |
Meter # _______________ |
CTs- |
|
||||||||||
Present Service OK |
Loop Only |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
________ |
|
|
|||||
Taps Only |
|
|
See Job # ________________________________ |
|
Indoo |
Outdoor |
|
On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above |
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
r |
|
|
|
|
|
Ground |
|
|
|
||||
ADVANCE NOTIFICATIONS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER BILLING: |
|
|
|
||||||
Underwriter’s Cert. |
|
Yes |
No |
|
|
|
|
|
|
|
|
|
Advance Billing |
Yes |
|
$_______________ |
|||||||
Required |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Required |
|
|
|
__ |
|||
Customer to Trench |
|
Yes |
No |
|
|
|
|
|
|
|
|
|
|
|
|
No Customer |
|
|
|||||
Permit Required |
|
Yes |
No |
State |
Other |
|
|
|
|
|
|
|
Charges: |
$_______________ |
|||||||||
|
|
|
|
|
|
|
|
|
|
|
__ |
||||||||||||
|
|
|
|
|
|
|
|
_______________________ |
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
Cust. # |
|
|
Date |
|
|
||||||||
ACT 222 Cert. Required |
|
Yes # |
|
|
No |
N/A |
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
_________________________ |
|
___________________________ |
||||||||||||
|
|
|
_____________ |
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
BTCO # |
|
|
Date |
|
|
||||||
PA One Call # |
|
|
|
|
|
|
|
Date |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
________________________ |
|
___________________________ |
||||||||
___________________________ |
|
|
|
|
__________________________ |
|
|
||||||||||||||||
|
|
|
|
|
CATV # |
|
|
Date |
|
|
|||||||||||||
Gas |
BTCO |
CATV |
Other |
|
Date |
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
________________________ |
|
___________________________ |
||||||||||||||
|
|
|
|
|
___________________ |
__________________________ |
|
|
|||||||||||||||
|
|
|
|
|
|
Other |
|
|
Date |
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
__________________________ |
|
___________________________ |
|||||
SKETCH / INSTRUCTIONS
PECO
Application for Electric Service & Meter
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL
NEW BUSINESS SERVICES
PHILADELPHIA COUNTY |
DELAWARE & CHESTER COUNTIES |
BUCKS & MONTGOMERY |
|
|
|
|
|
NEW RESIDENTIAL |
|
|
|
|||||||||||||||||||||||||
830 S. Schuylkill Ave. |
1050 W. Swedesford Rd. |
|
COUNTIES |
|
|
|
|
|
|
|
|
CONSTRUCTION |
|
|
|
|||||||||||||||||||||
Philadelphia, PA 19146 |
Berwyn, PA 19312 |
|
400 Park Ave. |
|
|
|
|
|
|
|
|
(All Counties) |
|
|
|
|
|
|
||||||||||||||||||
Email:PhilaNewBusiness@ex |
Email:DelChesterServiceApplications@exe |
Warminster, PA 18974 |
|
|
|
|
|
|
400 Park Ave. |
|
|
|
|
|
|
|||||||||||||||||||||
eloncorp.com |
|
|
loncorp.com |
|
|
|
Email:Bucksmontserviceapplications@e |
|
Warminster, PA 18974 |
|
|
|
||||||||||||||||||||||||
Fax # (215) |
Fax # (610) |
|
xeloncorp.com |
|
|
|
|
|
|
|
|
Email:NRCGMETERORDERS@P |
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER NAME |
|
|
|
|
Tax ID # or SSN |
|
|
|
TYPE OF REQUEST |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
New Service |
|
|
Load Increase/Decrease |
|
Reintroduction of Service |
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Temporary Service |
Upgrade/Changes |
|
Demolition (Remove |
|||||||||||||||||||||
** ADDRESS TO BE SERVED |
|
|
APARTMENT/LOT # |
|
|
|
Separation of Wiring |
Service Relocation |
|
|
Service) |
|
|
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
energize/Cover) |
|
|
|
||||
CITY, STATE |
|
|
|
|
ZIP CODE |
|
|
|
TYPE OF SERVICE: Please include site plan. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RESIDENTIAL |
|
|
|
|
|
|
|
|
|
COMMERICAL |
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Single House |
Mobile Home |
Store |
|
|
|
|
Office |
|
|
|
||||||||||||||
UTILITY POLE# |
SUBDIVISION/DEVELOPMENT |
|
TOWNSHIP/MUNICIPALITY/WARD# |
|
Apartment |
Modular Home |
Industrial |
|
|
|
|
Warehouse |
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Duplex |
Town House |
Restaurant |
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Other _____________________________ |
Other _____________________________ |
|||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Area of Building _______________________ Sq. Ft. |
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
* |
If Applicable |
|
|
|
|
|
|
|
|
|
SERVICE CHARACTERISTICS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
** |
Please use this address when applying for underwriter’s inspection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
WIRES |
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Underground |
|
|
Aerial |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
CUSTOMERS BILLING ADDRESS |
|
|
PECO ENERGY ACCOUNT# |
|
|
|
|
|
|
|
|
|
|
3 |
|
|
240 |
|
3 |
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
AMPS _________ |
|
|
|
|
3 |
|
|
120/240 |
|
4 |
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
WIRES |
|
|
|
|
|
3 |
|
|
120/208 |
|
4 |
|
|
|||||
CITY, STATE |
|
ZIP CODE |
|
TELE. # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120 |
|
|
2 |
|
|
|
|
|
3 |
|
|
277/480 |
|
4 |
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120/240 |
|
3 |
|
|
|
|
|
3 |
|
|
13200 |
|
3 or 4 |
|
||||||
SEND REPLY TO: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
120/240 |
|
5 |
|
|
|
|
|
3 |
|
|
33000 |
|
3 or 4 |
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
ELECTRICIAN’S OR BUILDER’S NAME |
|
|
|
|
|
|
|
METER INFO: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Two Meters, Commercial (General/Totalizer) |
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Single Meter Required |
|
|
|
|
|
Multiple Meter Total No. _____________ |
||||||||||||||||||
ADDRESS |
|
|
|
|
Reply Requested by: |
|
|
|
HEATING/AIR CONDITIONING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
/ |
/ |
|
|
Central Air _____ Tons |
|
Resistance |
|
|
|
|
|
Heat Pump _____ Tons |
|||||||||||||||||
|
|
|
|
|
|
|
|
|
Natural Gas |
|
|
|
Propane |
|
|
|
|
|
|
Type |
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other ________________ |
|||||||
CITY, STATE |
|
|
|
|
ZIP CODE |
|
|
|
CHARACTERISTICS OF NEW OR ADDITIONAL LOAD: |
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONNECTED |
|
PECO ENERGY USE ONLY (DEMAND) |
|||||||||||||||||
TELE. # |
|
|
|
|
|
|
|
|
|
TYPE |
|
LOAD (kW) |
|
SUMMER (kW) |
|
Winter (kW) |
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
LIGHTING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
CURRENT CONSUTRCTION STATUS: |
|
|
|
|
|
|
|
HEATING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
Not Started – Date Customer Will Start Work: _____/_____/_____ In Progress Completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
AIR/COND. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
Approximate Date Service Requested: _____/_____/_____ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
TANKLESS WATER HTR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MISC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
CUSTOMER COMMENTS/ DESCIPTION OF WORK: |
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Include single line diagram and substation arrangement if appropriate. |
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
LARGEST MOTOR SPECIFICATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
QUANTITY |
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTALIZER LOAD |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
SIZE (HP) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
LOCKED ROTOR CURRENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KW |
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
MOTOR CODE LETTER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
SUBMITTED BY: _________________________________ DATE: ______________________ |
|
|
PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
GENERAL LOAD |
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
VOLTAGE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
PECO
Application for Electric Service & Meter
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
PURPOSE
KW
INFORMATION BELOW WILL BE FILLED IN BY PECO: |
|
|
|
|
|
|
|
|
|
|
|
Service Request No. |
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
BUS/MAJ ACCT REP |
|
TELEPHONE |
|
DATA RECEIVED |
DESIGNER |
|
|
|
|
|
|
DATA RECEIVED |
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TELEPHONE |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
POL SUB |
|
RATE |
|
RIDER |
|
CONTRACT LIMITS |
|
SIC NUMBER |
|
|
T NUMBER |
|
DATE REPLY |
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMPLETED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
AMPS |
|
WIRES |
|
VOLTAGE |
PHASE |
|
CIRCUIT |
|
|
|
|
|
|
LOAD (KVA) |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUMMER_____WINTER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
____ |
|
SERVICE CHARACTERISITICS – Select One from Each |
|
|
|
|
|
|
|
|
|
POLE # / MH # LOCATION |
|
|
CUT THROUGH DATE |
|||||||||||
SERVICE TYPE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Aerial |
|
|
|
Underground |
|
URD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
RATE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Residential |
|
|
Comm |
Comm (Demand) |
|
HT/PD |
|
|
|
|
|
|
|
|
|
|
|
|
||||||
GENERATION PROCUREMENT CLASS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
Class 1 (Residential) |
|
|
|
Class 2 (Commercial, less than 100kW) |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
Class 3 (Commercial, 100kW to 500kW) |
|
Class 4 (Commercial, greater than 500kW) |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for |
|
|
|
|
|
|
|
|
|
|
||||||||||||||
the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage. |
|
|
|
|
|
|
|
|
|
|
||||||||||||||
METER TYPE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KWH |
|
|
IND. DEMAND |
|
RECORDER |
TOU |
|
|
|
|
|
|
|
|
|
|
|
|
||||||
SERVICE PHASING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
SINGLE PHASE |
TWO PHASE |
|
THREE PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
SERVICE REQUIREMENTS: |
|
|
|
|
|
|
METERING LOCATION AND REQUIREMENTS: |
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
Present Location: |
Meter # _______________ |
|
CTs- ________ |
|
||||||||||
Present Service OK |
Loop Only |
|
|
|
|
|
Indoor Outdoor |
On ________ |
Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground |
|||||||||||||||
Taps Only |
|
|
See Job # _________________________________ |
|
||||||||||||||||||||
ADVANCE NOTIFICATIONS: |
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER BILLING: |
|
|
|
|
|
|
|
|||||
Underwriter’s Cert. Required |
|
Yes |
No |
|
|
|
|
|
|
|
Advance Billing Required Yes |
|
|
$_________________ |
||||||||||
Customer to Trench |
|
Yes |
No |
|
|
|
|
|
|
|
|
|
|
|
|
No Customer Charges: $_________________ |
||||||||
Permit Required |
|
|
|
Yes |
No |
State |
Other _______________________ |
Cust. # _________________________ |
Date ___________________________ |
|||||||||||||||
ACT 222 Cert. Required |
|
Yes # _____________ |
No |
N/A |
|
|
|
|
BTCO # ________________________ |
Date ___________________________ |
||||||||||||||
PA One Call # ___________________________ |
|
|
Date __________________________ |
CATV # ________________________ |
Date ___________________________ |
|||||||||||||||||||
Gas |
BTCO |
CATV |
Other ___________________ |
Date __________________________ |
Other __________________________ |
Date ___________________________ |
||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SKETCH / INSTRUCTIONS
Document Information
| Fact Name | Fact Description |
|---|---|
| Application Purpose | The Peco Service and Meter Application form is used to request electric service and meter installation from PECO. |
| Required Information | Applicants must provide personal identification, including a driver's license number or Social Security number. |
| Construction Status | The form requires applicants to indicate their current construction status, such as whether the work has started or is completed. |
| Service Types | Options for service types include residential, commercial, and industrial, among others. |
| Load Characteristics | Applicants must complete a table detailing load characteristics, including connected KW and maximum demand for both summer and winter. |
| Inspection Requirement | All work must comply with the PECO Electric Service Requirements manual and be inspected by an approved agency. |
| Application Processing | Incomplete applications may lead to delays in processing, so thoroughness is essential. |
| Communication Deadline | PECO reserves the right to cancel requests if no communication is received within 90 days of their response. |
| Demolition Notice | For building demolitions requiring service removal, applicants must contact 8-1-1 (PA One Call). |
| Regional Offices | Applications must be sent to the appropriate PECO regional office based on the service location. |
Peco Service And Meter Application - Usage Guidelines
Filling out the PECO Service and Meter Application form requires attention to detail. Completing the form accurately ensures that your request is processed without unnecessary delays. Follow these steps to fill out the application correctly.
- Read the instructions at the top of the application.
- Locate the PECO regional office where the service is requested. Check the appropriate box and prepare to mail or fax the completed application to that office.
- Fill in your name and the service location. Provide your Driver's License Number or Social Security Number. If applicable, include the PECO Energy pole number and/or Lot number.
- Complete the billing address or PECO account number from the last 60 days.
- Provide details about yourself as the electrician or contractor. Include your Tax Identification number and specify where you want the reply sent. Indicate the desired date for the reply.
- State your current construction status and the date when PECO service is requested. Avoid phrases like "as soon as possible."
- Indicate the type of request and type of service. Include the number of units and area per unit.
- Provide service characteristics and meter information.
- Complete the load characteristics table, detailing connected KW, maximum summer KW demand, and maximum winter KW demand for each applicable load type.
- Fill in the motor information table.
- If using compensated metering, indicate the totalizer and general load in KW.
- Add any additional comments you feel are necessary.
- Sign and date the application to complete the process.
Common PDF Forms
Advance Salary Application Form - Ensure that your request aligns with the company’s financial procedures.
For those looking to understand the advantages of a temporary Power of Attorney for a Child, this form provides an effective way to ensure your child's well-being while you are away. This document empowers designated individuals to handle important decisions that affect your child's daily life.
Wage and Tax Statement - Employers must handle W-2s with care to avoid identity theft risks.
Dos and Don'ts
When filling out the PECO Service and Meter Application form, there are several important dos and don'ts to keep in mind. Here’s a helpful guide:
- Do read the instructions carefully before starting the application.
- Do include your Driver's License Number or Social Security Number as required.
- Do ensure all fields are completed accurately to avoid delays in processing.
- Do sign and date the application before submission.
- Don't leave any fields blank; incomplete applications can lead to processing delays.
- Don't use vague terms like "as soon as possible" for your service request date.
- Don't forget to provide your electrician or contractor's Tax Identification number.
- Don't submit the application without verifying the service availability in your area.
Common mistakes
-
Incomplete Personal Information: Many applicants fail to provide complete information regarding the customer's name, service location, and required identification numbers. This includes the Driver's License Number or Social Security Number, which is now mandatory.
-
Incorrect Service Type Selection: Applicants often select the wrong type of service or request type. It is crucial to choose the correct category, such as "New Service" or "Load Increase," to avoid processing delays.
-
Failure to Specify Construction Status: Not indicating the current construction status can lead to confusion. Applicants should clearly state whether the work is "Not Started," "In Progress," or "Completed," along with the anticipated service request date.
-
Missing Signature and Date: A common oversight is neglecting to sign and date the application. The application must be signed to be considered valid, and missing this step can result in outright rejection.